Save time! Watch our assembling video.

Bearing constructions like walls and beams have to be measured horizontally and vertically, then positioned and structurally fixed. Prepare a clean and even spot fort the unloading of the elements on site. Unload packages from lorry with two belts and protection for edges and stack according to numbers. The packages are labelled (package number, weight and elements contained). The package numbers accord with assembly order.  Packages are packed in PE-stretch foil for protection. The foil is not a weather protection for ­storage on site. Please provide sufficient canvas covers for protection on site. 

Walter Rotach

MASTER CARPENTERAPPENZELLERLAND

«I have been working with Lignatur for many years because I am simply convinced by the system and it is easy to work with. It is very lightweight, easy to assemble, has an extremely accurate fit and is perfectly prepared. You can tell that there are carpenters at work at Lignatur, people who know what‘s important on building sites. Anyone who has never assembled LIGNATUR will be surprised by how fast it is.»

Recommendations for correct assembly.

Packages are packed in PE-stretch foil for protection. The foil is not a weather protection for ­storage on site. Please provide sufficient canvas covers for protection on site. 

On request we prepare assembly suspensions in the factory. Assembly suspensions and additional materials (shear connectors, joint insulation, sealing cord, trimmer etc.) are included in the labelled packages of the delivery.

For protection of the visible surfaces the bottom element of the package is turned upside down. Elements filled with chippings are transported with the visible surface facing down. They therefore have to be handled with care.