Save time! Watch our assembling video.

Bearing constructions like walls and beams have to be measured horizontally and vertically, then positioned and structurally fixed. Prepare a clean and even spot fort the unloading of the elements on site. Unload packages from lorry with two belts and protection for edges and stack according to numbers. The packages are labelled (package number, weight and elements contained). The package numbers accord with assembly order.  Packages are packed in PE-stretch foil for protection. The foil is not a weather protection for ­storage on site. Please provide sufficient canvas covers for protection on site.